Construction Project Bid Results

Subscribe to this page to receive e-mail notification when new information is posted

Current construction project bid opportunities

Bid results are listed in order of Bid Date, most recent date first, in the following format.

Specification No. - Project Name

Apparent Low Bidder - Bid Amount
Subcontractors listed if available

City of Berkeley contact name and phone number.  TDD for all is (510) 981-6903.

Documents in pdf format require Acrobat Reader for viewing. Download a free copy from Adobe's website: GetAdobeLogo
If you are unable to view the document online, call the listed City contact.


New June 2, 2015

15-10940 - Fire Drill Tower Repair Phase I

CNW Construction - $63,000

15-10940 Bid Results (.pdf)

Taylor Lancelot, (510) 981-6421


May 28, 2015

15-10939-C - Flare Station Replacement and Well Field Upgrades

Innovative Construction Solutions - $656,000

15-10939-C Bid Results (.pdf)

Taylor Lancelot, (510) 981-6421


NewMay 28, 2015

15-10936-C - Sanitary Sewer Rehabilitation - Hopkins, Peralta, Monterey, The Alameda, Boynton and backlines

Andes Construction - $3,357,444

15-10936-C Bid Results (.pdf)

Tiffany Pham, (510) 981-6427


May 26, 2015

15-10947 - Echo Lake Camp - Commercial Kitchen Hood/Ventilation Upgrade

Belz Construction - $138,000

15-10947 Bid Results (.pdf)

Craig Veramay, (510) 981-6717


May 26, 2015

15-10937-C - HHCS Landscape Improvements

DPI General Contractor - $200,926

15-10937-C Bid Results (.pdf)

Linda Salas, (510) 981-6402


May 7, 2015

15-10946 - PRW Facilities Painting Services

Horizon Brothers Paint - $46,400

15-10946 Bid Results (.pdf)

Susan Ferrera, (510) 981-6667


May 5, 2015

15-10944-C - FY 2015 Rubberized Cape Seal

VSS International, Inc. - $999,500

15-10944-C Bid Results (.pdf)

Don Irby, (510) 981-6439


May 5, 2015

15-10943-C - FY 2015 Slurry Seal and Rubberized Cape Seal Project

VSS International, Inc. - $1,017,695

15-10943-C Bid Results (.pdf)

Don Irby, (510) 981-6439


March 17, 2015

15-10933 - Terrace View Park Drainage Improvements

W. R. Forde Associates - $154,676

15-10933 Bid Results (.pdf)

Danny Akagi, (510) 981-6394


March 17, 2015

15-10920-C - Potter Bay Bolivar Paving

GradeTech Inc. - $828,253.50

Subcontractors listed:

Bayside Stripe & Seal, Petaluma, striping
Mid State Barrier Inc., Stockton, guardrail
Griffin Soil, Walnut Creek, cement treat

15-10920-C Bid Results (.pdf)

Wendy Wong, (510) 981-6428


March 17, 2015

15-10877-C - Sanitary Sewer - Downtown Shattuck Area

Express Plumbing - $922,945

15-10877-C Bid Results (.pdf)

Kenneth Emeziem, (510) 981-6444


March 5, 2015

15-10923-C - FY 2015 Measure M Street Resurfacing and Reconstruction

Gallagher & Burk, Inc. - $5,332,331.50

Subcontractors listed:

Johnson Construction Company
J.J.R. Construction Inc.
Griffin Soil
Linear Options, Inc.
T.D.W. Construction Inc.
Loop Installation and Repair
Farwest Safety Inc.
Penhall Company
Bond Blacktop Inc.

15-10923-C Bid Results (.pdf)    15-10923-C Bid Abstract (.pdf)

Don Irby, (510) 981-6439


March 5, 2015

15-10922-C - FY 2015 Measure M Street Surface Seal

American Pavement System - $2,715,147.30

Subcontractors listed:

O’Grady Paving
Telfer Highway Technologies
Bayside Stripe & Seal
Johnson Construction Company
Rubberized Crackfiller Sealant
JJR Construction

15-10922-C Bid Results (.pdf)    15-10922-C Bid Abstract (.pdf)

Don Irby, (510) 981-6439


March 3, 2015

15-10884-C - Street Rehabilitation FY 2015

MCK Services - $2,187,475.10

Subcontractors listed:

Bayside Stripe & Seal, Petaluma, striping/signage
Intermountain Slurry Seal, Sacramento, microsurfacing
Schotka Construction, American Canyon, construction signs
JCC, Concord, adjust utilities
Rosas Brothers, Oakland, concrete

15-10884-C Bid Results (.pdf)   15-10884-C Bid Abstract (.pdf)

Wendy Wong, (510) 981-6428


February 26, 2015

15-10911-C - FY15 Proactive Sidewalk Project

AJW Construction - $237,425

15-10911-C Bid Results (.pdf)

Sean Rose, (510) 981-6435


February 26, 2015

15-10910-C - FY15 Responsive Sidewalk Project

AJW Construction - $227,917.50

15-10910-C Bid Results (.pdf)

Sean Rose, (510) 981-6435


February 19, 2015

15-10913 - Survey Monument Replacement Project

JCC Inc. - $127,850

15-10913 Bid Results (.pdf)   15-10913 Bid Abstract (.pdf)

Wendy Wong, (510) 981-6428


February 17, 2015

15-10927- FY 2015 John Hinkel Clubhouse Emergency Demolition & Recovery Services

Asbestos Management Group of California - $81,250

15-10927 Bid Results (.pdf)

Roger Rushing, (510) 981-6422


January 15, 2015

15-10908-C - FY 2015 Storm Drainage and Valley Gutter Improvement Project

GradeTech Inc. - $563,465.70

15-10908-C Bid Results (.pdf)

Danny Akagi, (510) 981-6394


January 8, 2015

14-10856-C - Terrace View Park Phase One Renovation

McNabb Construction - $265,300

14-10856-C Bid Results (.pdf)

McNabb Construction Subcontractor List

Bay Construction Subcontractor List

Deborah Chernin, (510) 981-6715


December 30, 2014

15-10903-C - Sanitary Sewer Rehabilitation - Manhole Rehabilitation

Mosto Construction - $188,000

15-10903-C Bid Results (.pdf)

Tiffany Pham, (510) 981-6427


December 16, 2014

15-10878-C - Sanitary Sewer Rehabilitation - Panoramic Way Area Phase III

Pacific Trenchless - $421,917

15-10878-C Bid Results (.pdf)

Reeve Battle, (510) 981-6336


December 11, 2014

15-10898-C - FY 2015 Measure M LID Project

ProVen - $914,255

15-10898-C Bid Results (.pdf)

Danny Akagi, (510) 981-6394


November 4, 2014

15-10879-C - Sanitary Sewer Rehabilitation - Parker Street (Bayer Healthcare Easement)

Precision Engineering - $133,040

15-10879-C Bid Results (.pdf)

Evelyn Chan, (510) 981-6430


October 21, 2014

15-10889-C - Sanitary Sewer Rehabilitation - MLK Jr. Way, 5th Street, Cedar Street

Pacific Trenchless, Inc. - $704,882

15-10889-C Bid Results (.pdf)

Evelyn Chan, (510) 981-6430


October 21, 2014

14-10862-C - Sanitary Sewer Rehabilitation - Hearst Avenue from Bonita to Shattuck

Precision Engineering, Inc. - $279,304

14-10862-C Bid Results (.pdf)

Tiffany Pham, (510) 981-6427


August 22, 2014

15-10881 - FY 2015 Bike Rack Installlation

AJW Construction - $104,000

15-10881 Bid Results (.pdf)

Vincent Chen (510) 981-6409


August 12, 2014

14-10845-C - Virginia-McGee Totland Play Area Renovation

McNabb Construction - $344,960

14-10845-C Bid Results (.pdf)

Deborah Chernin, (510) 981-6715


August 5, 2014

14-10864-C - Echo Lake Camp Structural Remediation

Belz Construction - $94,000

14-10864-C Bid Results (.pdf)

Paul Kaushal, (510) 981-6396


July 24, 2014

14-10876 - 2925/2945 Bolivar Paving Project

Alaniz Construction - $40,754.70

14-10876 Bid Results (.pdf)  14-10876 Bid Abstract (.pdf)

Christina Erickson, (510) 981-6703


June 17, 2014

14-10791 - FY 2014 Pathways Improvement Project

California Constructores - $9,960

14-10791 Bid Results (.pdf)

Vincent Chen, (510) 981-6409


June 5, 2014

14-10874 - Oxford/Berkeley Bulb-out & Page/Santa Fe Traffic Circle

AJW Construction - $181,082.50

14-10874 Bid Results (.pdf)

Paul Kaushal, (510) 981-6396


May 29, 2014

14-10865 - Claremont Creek Culvert Repair at Hazel Road

Gold Wing Engineering - $85,000

14-10865 Bid Results (.pdf)

Danny Akagi, (510) 981-6394


April 22, 2014

14-10851-C - FY 2014 Measure M LID Projects

Grade Tech - $673,131

14-10851-C Bid Results (.pdf)

Danny Akagi, (510) 981-6394


April 8, 2014

14-10853 - Sanitary Sewer Rehabilitation - Carleton at Mabel and 2031 6th St

Gold Wing Engineering - $144,957

14-10853 Bid Results (.pdf)

Ron Ranada, (510) 981-6415