BERKELEY DRAFT GENERAL PLAN EIR

TABLE OF CONTENTS

 I.       INTRODUCTION     pdf  html 
 II.       SUMMARY   pdf html 
 III.      PROJECT DESCRIPTION  pdf  html 
IV.      SETTING, IMPACTS AND MITIGATION MEASURES pdf  html 
 A.       Land Use pdf  html
 B.       Population, Employment, and Housing pdf  html 
 C.       Community Services pdf  html 
 D.       Transportation pdf   
 E.       Infrastructure

pdf 

html 
 F.       Urban Design and Visual Quality pdf  html 
 G.       Cultural Resources pdf  html 
 H.       Open Space and Recreation pdf  html 

I.        Geologic and Seismic Hazards

pdf  html 

J.        Hydrology and Water Quality

pdf  html
K.       Natural Resources pdf  html 
L.       Air Quality pdf  html 
 M.      Noise pdf   

N.       Hazardous Materials

pdf  html 

V.       ALTERNATIVES TO THE PROPOSED PROJECT

pdf  html 

VI.      CEQA REQUIRED ASSESSMENT CONCLUSIONS

pdf 

html 

VII.     REPORT PREPARATION  

pdf  html 

                      

                               

<